当前位置:首页-资讯中心>公司新闻标志桩铺设对施工方提出了几项要求

标志桩铺设对施工方提出了几项要求

来源:http://www.binzhouhengtong.com/ 发布时间:日期:2022-07-15 0
标志桩与其他材料标志桩相比,标志桩的优势非常多,而且警示效果非常高,因为标志桩的颜色是在生产中添加到原材料中的,而不是刷上去的,所以不会出现浮色和掉色的情况,并且可以长期使用下去。标志桩铺设对施工方提出了几项要求:
Compared with other material marker posts, marker posts have many advantages, and the warning effect is very high. Because the color of marker posts is added to raw materials in production, rather than painted, there will be no floating and fading, and they can be used for a long time. The laying of sign piles puts forward several requirements for the construction party:
一、是在开工前编制施工组织设计及施工方案,施工进度计划,材料设备、成品、半成品等进场计划送监理审批后再交业主。并在进场后抓紧做好项目划分单位工程、单元工程、工序工程。
1、 It is to prepare the construction organization design and construction scheme, construction schedule, mobilization plan of materials and equipment, finished products, semi-finished products, etc. before the commencement of construction, and submit them to the owner after being approved by the supervisor. After entering the site, the project shall be divided into unit works, unit works and process works.
二、是开工前要行场地清理,包括开挖区的杂草、垃圾、不可利用的表土及其障碍物,应对测量控制点及放线位置进行校核,开挖边线应有足够数量的标志桩,并要注意防止移位、损坏。施工方需邀请村委和群众代表一同参与放线工作,避免发生不必要的矛盾,保证工程开工顺利进行。
2、 It is necessary to clean the site before construction, including weeds, garbage, unusable topsoil and obstacles in the excavation area. The measurement control points and setting out positions should be checked. There should be a sufficient number of marker piles on the excavation sideline, and attention should be paid to prevent displacement and damage. The construction party needs to invite the village committee and representatives of the masses to participate in the setting out work to avoid unnecessary contradictions and ensure the smooth commencement of the project.
三、是开挖和回填土方面:标志桩开挖基础的深度和宽度要符合按设计要求,如有异常现象应及时向监理、业主汇报,待做出处理决定后再继续施工,回填土要按照要求进行回填,否则一律不予验收。
3、 In terms of excavation and backfill: the depth and width of the excavation foundation of the sign pile should meet the design requirements. If there is any abnormal phenomenon, it should be reported to the supervisor and the owner in time, and the construction can continue after making the treatment decision. The backfill should be backfilled according to the requirements, otherwise it will not be accepted.
地埋标志桩
四、是隐蔽工程必须经监理及现场代表到现场核实、验收签证并拍照后,方可进行下一道工序,施工方必须将工程签证资料在相应工程结束后5天内完成并提交给业主。
4、 For concealed works, the next process can be carried out only after the supervisor and on-site representative come to the site to verify, accept and take photos. The construction party must complete and submit the project visa data to the owner within 5 days after the completion of the corresponding project.
标志桩作为现在受欢迎的警示设备之一,它在各个行业都已经广泛应用了起来,很多客户都将标志桩安装到各大型户外场所,以起到警示效果。标志桩采用的是树脂和玻璃钢纤维作为原料制成,因此性能极高,在任何恶劣环境下都能使用,并且不用随时维护。
As one of the popular warning devices, sign piles have been widely used in various industries. Many customers install sign piles in large outdoor places to have a warning effect. The sign pile is made of resin and glass fiber reinforced plastic fiber as raw materials, so it has high performance and can be used in any harsh environment without maintenance at any time.
地埋标志桩在室外使用优势会更加明显,因为玻璃钢具有耐腐蚀、抗老化,防撞击等多种优势。因此在户外使用过程中不会受天气影响而减小警示效果,也不会因为撞击而无法使用。
The advantages of buried marker piles in outdoor use will be more obvious, because FRP has many advantages, such as corrosion resistance, aging resistance, impact resistance and so on. Therefore, in the process of outdoor use, it will not be affected by the weather to reduce the warning effect, nor will it be unable to use due to impact.
以上就是今天为大家介绍的关于问题以及注意事项的全部内容,希望对大家能有所帮助,想要了解更多内容可以电话联系我们或者关注我们的网站http://www.binzhouhengtong.com,我们的工作人员会及时与您取得联系。
The above is all about the problems and precautions introduced to you today. I hope it can help you. If you want to know more, you can contact us by phone or follow our website http://www.binzhouhengtong.com , our staff will contact you in time.